Case Studies

Riverdale

Riverdale Country School

When this school needed “swing space” away from ongoing construction and renovations, WillScot swung into action with a modular classroom solution featuring aluminum decks with ramps and aluminum awnings.

Valor Academy

Valor Academy for Boys

Valor Academy needed additional classroom space to support increased enrollment, and WillScot configured 17 modular units to create eight new classrooms and a restroom facility in just two months’ time.

Volvo

Volvo Dealerships of Princeton and Bridgewater

During renovations, these two car dealerships needed to maintain their commitment to service excellence, so WillScot provided each with a single story Flex complex outfitted with Executive, Premium and Basic Office Packages.

Wacker

Wacker Polysilicon

This company needed a temporary facility to house 200+ employees during construction of a $1.5 billion manufacturing facility, and WillScot delivered a 71,396 square foot administrative office complex.

Wallenius

Wallenius Wilhemsen Logistics/ MAT

When the outdated Mid-Atlantic Terminal (MAT) at the Port of Baltimore needed a replacement, WillScot delivered a custom 64’ X 65’ complex for workers using four modular office units.

building

Rite Aid

After riots and looting destroyed a Baltimore Rite Aid drugstore, WillScot was able to configure a temporary store site in just eight days so the community could continue being served.

building

Woodrow Wilson Bridge Project

WillScot delivered two five-section Redi-Plex modular office buildings with turnkey construction for both sides of a major bridge construction project.

Two story temporary buildings used for social distancing workspace during Covid-19 vaccine development

Covid-19 Vaccine Development Office Space

When a local Baltimore biopharmaceutical company was tasked by Johnson & Johnson to produce a potential COVID-19 vaccine, they quickly began making plans to transition their modular office swing space into additional vaccine development workspace.

Large multi-unit temporary office used during construction.

CRB Builders

In Maryland, CRB Builders was hired to build out Novavax’s new office building from an existing shell building. Under a tight project deadline, CRB Builders immediately sprang into action and began searching for two temporary office spaces that could be quickly delivered for their team and their client, so that they could all get right to work.

Three unit temporary sales office used during the renovation of a car dealership.

Criswell Ford

A car dealership in the DMV area, (DC, Maryland, and Virginia), needed a sales office while their dealership was under renovation.

Covid-19 Testing Space

Jewish General Hospital

Having worked with WillScot in the past, the hospital turned to WillScot’s local Montreal team to deliver a modular solution in less than a month. In 30 days, the first of two new testing clinics was set up on top of a parking structure adjacent to the hospital.

Three story FLEX complex used during the construction of a hotel.

Loews Hotels

When a local construction company won their bid to build a new Loews Hotel in downtown Arlington, TX, adjacent to the Rangers’ baseball stadium and Texas Live, the builder had to get the project moving quickly to deliver on time.