Modular
Building Institute - Best of Show Award for 2003 Williams Scotsman Mid-Atlantic
Region Headquarters Main Category:
Permanent Factory-Built Category:
Office over 10,000 sq.ft. Company:
Williams Scotsman Location:
Harmans, MD Total Square Feet:
13,070 Days to Complete:
325
Award Criteria
Architectural Excellence The modular facility boasts a
two story open lobby with glass façade. The exterior
treatment includes architectural grooves patterned with
oversized windows and color banding. Angled walls create
an updated clean appearance. The modular facility is adjoined
by a 20,000 sq ft pre-engineered shop facility. A two-story
office space provided site flexibility to support busy
fleet operations. The lobby features a staircase, reception
area and a custom designed feature wall, entrance sign
and millwork. Two additional staircases and an elevator
provide easy access between the office areas and the shop.
Also included is a large meeting room, two conference
rooms, driver area, interior glazing, custom wood trims,
custom millwork, central copy and file areas, upgraded
wall & floor coverings, and custom furniture. The
floors feature perimeter offices with central open space.
Restrooms featuring ceramic tile walls and floors and
stainless steel modesty partitions are located throughout.
Technical Innovation To provide the most flexibility,
Williams Scotsman utilized clear span beams to span the
open office areas of all modules. Eliminating columns
in the open office space created a clean atmosphere and
allowed for relocation of modular furnishings and offices
within the space. A state of the art communications system
was provided throughout the facility. Data and voice are
combined, all systems are interconnected through the phone
as well as computer systems. A centralized paging system
allows communication with office personnel as well as
the shop facility. Roof mounted HVAC units were utilized
for both floors to provide the cleanest site appearance
possible. A roof hatch with ladder (provided in a closet)
affords easy access to the rooftop equipment for servicing.
Cost Effectiveness/Energy Efficiency Even with the nature of this long-term
project, the modular building approach was the most cost-effective
solution. Increased spans, energy efficient rooftop equipment,
insulated glazing and site installed synthetic stucco
exterior all contributed to a cost effective and energy
efficient facility. All (16) units were constructed with
a minimum of R-30 insulation in the roof, R-13 insulation
in the walls and R-19 insulation in the floor. Combined
with the 2” synthetic stucco exterior finish, additional
efficiency in maintaining building temperatures is accomplished.
All plumbing fixtures are flush valve water conservation
type. Electrical lighting was accomplished utilizing energy
efficient ballasts with reduced wattage bulbs. Additional
bi-level switching is provided throughout the building.
All exterior lighting is photocell controlled.
Calendar Days to Complete(from production start to date
occupied) - 325 days.
|